The BFCG Call for Projects Guidebook provides instruction and guidance for the 2019 call for projects.
The results of the call for projects can be seen here. The BFCG Board approved funding of the 2019 call for projects on December 20, 2019.
Below are the 29 applications received and scoring sheets for the 2019 BFCG Call for Projects. The applications and scoring sheets are separated by funding source. Only 14 projects were selected to receive funding during the process.
Urban Large STBG/HIP (scoring sheet)
Kennewick
- Columbia Center Blvd and Quinault Avenue Intersection Improvements
- Columbia Center Blvd and Deschutes Avenue Intersection Improvements
- Steptoe Street and Gage Blvd Intersection Improvements (joint with Richland)
Richland
- Columbia Park Trail – East
- Gage Boulevard Improvements
- Leslie Road – Keene Road – Gage Blvd Microsurface
- South George Washington Way Intersection Improvements
- SR 240 – Aaron Flyover
- Swift Blvd and Wright Avenue Roundabout
Pasco
- Argent Road Widening Phase III
- Court Street and Road 68 Intersection Improvements
- Lewis St Corridor (2nd to 5th)
- Sandifur Parkway Extension Phase I
West Richland
Rural/Urban Small STBG (scoring sheet)
Benton County
Franklin County
TAP/STBG (scoring sheet)
Urban Large
Ben Franklin Transit
- Center Parkway Pedestrian Crossing (Columbia Center Mall)
- Columbia Center Boulevard Crossing (Columbia Center Mall)
Benton County
Richland
- Columbia River to Vista Field – Grade Separated Crossing (joint with Kennewick)
- Jadwin Bike Lanes and RRFB Crossing at Catskill Street
- Vantage Highway Path Phase II
Pasco
West Richland
Urban Small
Prosser
Rural
Benton City
Franklin County